A better question than "how smart is it?"
Most ways of scoring AI models answer a narrow question: what share of this test did the model get right? That number is useful until the test is solved, and then it says nothing. It also says little about work. A model that answers 90% of exam questions may still fall apart on a job that takes a person an afternoon.
METR, an organisation that evaluates frontier AI models, asked a different question: how long a task can an AI agent finish on its own? Length here means the time a skilled human professional needs for the same task. The answer is a single number in minutes or hours, it keeps meaning the same thing as models improve, and it maps directly onto the way you plan work. If an agent reliably finishes two-hour tasks, you can hand it two-hour tasks.
METR published the first version of this research on 19 March 2025. The headline was that the length of tasks agents complete at 50% reliability had doubled roughly every seven months for about six years. In January 2026 METR rebuilt the task suite and re-measured, and the doubling time got shorter, not longer. As of November 2026 nothing in their published data shows the trend slowing.
How METR measures it
The method has three parts, and each one matters when you read the result.
- A suite of timed tasks. METR collected software and reasoning tasks of very different lengths: very short software tasks, the HCAST suite of varied engineering and research tasks, and RE-Bench, a set of hard machine-learning research problems. Each task is timed on humans with the right expertise, which gives it a length.
- Agents attempt every task. Each model runs inside an agent scaffold (a harness, in our language) with tools to read files, run code and check its work. Every attempt is scored.
- A curve, then a crossing point. For each model METR fits a logistic curve of success probability against human task length. The model's time horizon is the task length where that curve crosses 50%. The same curve gives an 80% horizon, which is shorter.
The original study gives a sense of the shape. Models then had "almost 100% success rate" on tasks that take people under four minutes and succeeded less than 10% of the time on tasks over about four hours. The best model in March 2025, Claude 3.7 Sonnet, had a 50% horizon of about an hour.
Uncertainty is reported as a 95% confidence interval from a hierarchical bootstrap over task families, tasks and attempts. Those intervals are wide, and they get wider at the top end, which is the first thing to keep in mind.
The January 2026 rebuild
On 29 January 2026 METR released Time Horizon 1.1. The suite grew from 170 to 228 tasks, and tasks estimated at eight hours or more grew from 14 to 31, because the best models were running out of hard tasks to fail. METR also moved its runs to new evaluation software (from their own Vivaria to the open Inspect framework). Most re-measured models landed inside their old confidence intervals, but the trend moved: the doubling time since 2023 fell from 165 days under the old suite to 131 days under the new one.
The numbers, as of November 2026
METR publishes its estimates as a data file beside its time-horizons page. The chart below takes the models that file marks as the state of the art when they were released, plus Claude Opus 4.6, from benchmark_results_1_1.yaml. The scale is logarithmic: each step of equal length is a multiple, not an addition, which is the only honest way to draw a quantity that doubles.
50% time horizon of frontier models, Time Horizon 1.1 suite (log scale, 1 minute to 1 day)
- GPT-4Mar 20234 min
- GPT-4oMay 20247 min
- Claude 3.5 Sonnet (new)Oct 202421 min
- o1Dec 202439 min
- Claude 3.7 SonnetFeb 202560 min
- o3Apr 20252.0 h
- GPT-5Aug 20253.4 h
- Claude Opus 4.5Nov 20254.9 h
- GPT-5.2Dec 20255.9 h
- Claude Opus 4.6Feb 202612.0 h
- Claude Mythos Preview (early)Apr 202617.4 h*
Read the chart with two facts beside it. First, the confidence intervals are wide. The same file puts Claude Opus 4.6 at 719 minutes with an interval from 317 to 3,634 minutes, so somewhere between five hours and two and a half days. Second, METR's page says plainly that "measurements above 16 hrs are unreliable" with the current suite. The early Mythos Preview figure is past that line, and METR leaves points like it out when it fits the trend.
The doubling time
The same data file gives the trend directly. Fitting models from 2023 onward, excluding any point above 16 hours, the 50% horizon doubles every 129 days, with an interval from 104 to 158 days. Over the full history since GPT-2 in 2019, stitched across both suites, it doubles every 188 days. That gap is the story: the trend is not only exponential, the recent stretch is steeper than the long run. The January 2026 post put the doubling time since 2024 at 89 days.
Simple arithmetic turns that into something you can feel. A 129-day doubling is about 2.8 doublings a year, which is roughly a sevenfold increase in task length every year. The 188-day long-run rate is close to fourfold. The original paper made the same point another way: if their absolute measurements were off by a factor of ten, the date at which agents reach any given task length would move by only about two years. When something grows this fast, the exact level matters less than the slope.
METR's March 2025 post said that if the six-year trend held to the end of the decade, frontier systems could carry out month-long projects on their own. That is an extrapolation, and the authors say their sensitivity checks "do not account for future changes in the trend or external validity concerns". Treat it as a planning scenario, not a forecast.
50% is not 80%
The headline horizon is the task length an agent finishes half the time. That is a fine way to compare models. It is a poor way to plan work, because a task that fails half the time costs you the review of every attempt and the redo of half of them.
The 80% horizon is much shorter, and the gap has grown. In METR's file, Claude Opus 4.6 has a 50% horizon of about 12 hours and an 80% horizon of about 70 minutes. GPT-5.2 is at about 6 hours and 66 minutes. The early Mythos Preview measurement is about 17 hours at 50% and about 3 hours at 80%. The logistic curves for recent models are shallow: they get a lot of long tasks right, but they also keep failing some shorter ones.
| Model | 50% horizon | 80% horizon |
|---|---|---|
| Claude 3.7 Sonnet (Feb 2025) | 60 min | 12 min |
| o3 (Apr 2025) | 120 min | 30 min |
| GPT-5 (Aug 2025) | 203 min | 38 min |
| Claude Opus 4.5 (Nov 2025) | 293 min | 49 min |
| GPT-5.2 (Dec 2025) | 352 min | 66 min |
| Claude Opus 4.6 (Feb 2026) | 719 min | 70 min |
| Claude Mythos Preview, early (Apr 2026) | 1,045 min* | 186 min |
Source: point estimates from METR's benchmark_results_1_1.yaml, rounded to the minute. *Above METR's 16-hour reliability limit.
For an operator, the right column is the one to plan against. It also grows fast, but from a much lower base.
Where the method is weak
METR is unusually open about the limits of its own work. Five of them matter for anyone using the number.
The task mix changes the answer
The January 2026 post calls the trend "somewhat sensitive" to which tasks are in the suite. Swapping 15 tasks out and 73 in moved the post-2023 doubling time by about a fifth. the November 2023 GPT-4's horizon fell by 57% under the new suite while GPT-5's rose by 55%. The direction of the trend is robust; the exact rate is not.
The longest tasks are mostly estimated
Only 5 of the 31 tasks of eight hours or more had measured human baselines in January 2026. The rest have estimated times. At the top of the chart, where the interesting models are, the ruler itself is softer.
Software tasks, built to be checked
These are software and research tasks with automatic scoring. Real work has unclear goals, other people, messy repositories and no test that says "done". METR's own SWE-bench analysis notes that its time estimates leave out the time a person spends getting familiar with a codebase. A horizon measured on clean, self-contained tasks will overstate what an agent finishes in your repository without help.
The ceiling is close
METR says few tasks in the suite remain unsolved by the latest models and that it is working to raise the ceiling. Its time-horizons page also says it is "no longer actively updated", with the last update on 8 September 2026. So the newest models released this autumn have no published horizon at all, and the 16-hour limit means the very best measurements are already uncertain.
The harness matters less than you might think
This one cuts the other way. In a February 2026 note, METR ran Claude Opus 4.5 inside Claude Code and GPT-5 inside Codex and compared them with its own simple scaffolds. Neither commercial harness beat the default by a statistically significant margin. On these clean tasks, the model sets the horizon. On your tasks, the context you give it and the checks you set are what close the gap between the benchmark and the job.
A longer horizon is not the same as a faster team
It is tempting to read a 12-hour horizon as "the agent saves me 12 hours". METR's own field studies are a useful brake on that.
In a randomised study published in July 2025, 16 experienced open-source developers worked on 246 real issues in their own projects. With AI tools allowed, they took 19% longer, while they expected to be 24% faster and still believed afterwards that they had been 20% faster. METR now marks that result as outdated.
A follow-up with late-2025 tools did not settle the question either. METR's February 2026 update reports a 4% speed-up for newly recruited developers and 18% for returning ones, with intervals that include zero. METR calls this "very weak evidence" and thinks the true speed-up is larger, because many developers refused to work without AI at all and 30% to 50% held back tasks they did not want to do by hand. They are redesigning the study.
Agents help. But capability on a benchmark and speed-up in a real team are different measurements, and the second depends heavily on how the work is set up, briefed and checked.
What this means for operators
The time horizon is the most practical capability number there is, because it is already in the unit you plan in. Here is how we use it.
- Size tasks to the 80% horizon, not the 50% one. If the honest 80% figure for today's frontier models on clean tasks is around an hour to three hours, a brief that asks for two days of work in one go is planning to fail. Split it. That is what the decomposition module teaches: sessions, subagents and worktrees, each sized to finish.
- Make "done" checkable. METR's tasks have automatic scoring. Yours usually do not, until you write the checks. A brief with tests, a reproduction or a visible acceptance criterion moves your work closer to the conditions under which the horizon was measured. See the brief and verification.
- Re-plan every few months. At a doubling every four months or so, the right size of a task for an agent changes several times a year. Revisit the work you still do by hand on a schedule. Something that failed in spring may be routine by autumn.
- Longer runs need more steering, not less. A run that goes for hours fails in new ways: it drifts from the brief, runs out of context, or quietly works around a failing test. The steering module covers when to step in and when to let a long run finish; guardrails covers what it must never do on its own.
- Measure your own horizon. Your codebase, your tests and your briefs set your real number. Keep a simple log: task, estimated human time, agent result. After a month you will know where your 80% line is, and you will see it move.
The skill this trend rewards is the one in our guide to operating a harness: turning large, vague work into pieces an agent can finish and you can check. The pieces get bigger every year. The need to cut well does not go away. If you want to practise it on real work, the free course starts with the brief.
Sources
- "Measuring AI Ability to Complete Long Software Tasks", METR, 19 March 2025. metr.org/blog/2025-03-19-measuring-ai-ability-to-complete-long-tasks
- "Time Horizon 1.1", METR, 29 January 2026. metr.org/blog/2026-01-29-time-horizon-1-1
- "Task-Completion Time Horizons of Frontier AI Models", METR, last updated 8 September 2026. metr.org/time-horizons
- "benchmark_results_1_1.yaml" (per-model 50% and 80% horizons, release dates, doubling times), METR, accessed 28 November 2026. metr.org/assets/benchmark_results_1_1.yaml
- "Measuring Time Horizon using Claude Code and Codex", Nikola Jurkovic, METR, 13 February 2026. metr.org/notes/2026-02-13-measuring-time-horizon-using-claude-code-and-codex
- "Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity", METR, 10 July 2025. metr.org/blog/2025-07-10-early-2025-ai-experienced-os-dev-study
- "We are Changing our Developer Productivity Experiment Design", METR, 24 February 2026. metr.org/blog/2026-02-24-uplift-update